banner
Products
Highly skilled employees are critical to the company.
Mud Desander with or Without Shale Shaker for Drilling System

Mud Desander with or Without Shale Shaker for Drilling System

The desander with underflow shaker is also called Mini desander cleaner which is applicable for both weighted and unweig;
Basic Info.
Model NO. BHZJ
Type Desander
Working Pressure 0.25-0.4MPa
Ex Standard Exdiibt4 / IEC Ex/ Atex
Vibration Mode Linear Motion
Capacity 120-360m3/H
Transport Package Wooden Case
Origin China
HS Code 84749000
Production Capacity 1000units Per Year
Product Description
The desander with underflow shaker is also called Mini desander cleaner which is applicable for both weighted and unweighted drilling mud, while traditional desander no underflow vibrating screen only for unweighted drilling fluids. And comparing with large size mud cleaner, the Mini Desander is cost-effective. For compact mud system used in HDD, CBM, water well drilling and Mining project, Mini desander is an Ideal choice.

Main features of Linear Motion Shale Shaker:

1.Desander Options with shaker and without shaker for flexible applicaiton.2.Desander Cyclone PU material with better Abrasion resistance3.No under shaker design structure compact and assembly flexible3.Mini desander cleaner with shaker for both weighted / unweighted mud in various drilling
Desander is placed after shakers and degasser but before desilter. Different from the Shale Shaker separating solids by screen, desander removes those abrasive solids from the drilling mud by centrifugal force. Due to different density of solid and liquid, the very fine solid which cannot be removed by shakers could be separated out by desander. Desander is also the first one equipment to separate by using centrifugal force.
Main technical parameters
ModelGNZJ752F-1SF/2SFGNZJ703F-D2SFGNZJ703F-S3SFGNWS-2SF/3SF
Capacity120/240m3/h240m3/h 360m3/h240/360m3/h
Desander Size10 Inch
Desander Qty1/2pcs2pcs3pcs2/3pcs
Working Pressure0.25~0.4Mpa
Feeding Size6 inch
Output Size8 inch

Mud Desander with or Without Shale Shaker for Drilling System


Mud Desander with or Without Shale Shaker for Drilling System

Q1. Are you a manufacturer?

Yes, we have manufactured oilfield equipment for over 30 years. They are widely used in worldwide oilfields.

Q2. Do your equipment come with a warranty?

Yes, we have one year warranty.

Q3. Can we customize the equipment from you?

Yes, actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.

Q4. How do you deliver your equipment?

By sea or by air.

Q5. What's the lead time for the equipment and its spare parts?

Generally 30-45 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15-20 days.

Send inquiry